Design-Build P401V Traffic Mitigation Measures, Gates 3 & 4, National Naval Medical Center, Bethesda, MD
- Design/ Build automated Entry Control Facilities (ECFs) at Gates 3 and 4
- ECFs objective to secure installation from unauthorized access, to intercept contraband, and maximize traffic flow
- Features: Guard Booth situated on an island between inbound and outbound lanes, and canopied for security checks. The Guard Booth included one guard house measuring approximately 7’ x 21’, toilet, storage closet, and an emergency power generator
- Contract Value $5.9 Million
Work services included:
- Geotechnical investigation
- Demolition
- Excavation
- Underground utilities
- Grading
- Concrete foundations
- Masonry
- Framing and metal deck roof panels
- Plumbing
- HVAC
- Electrical
- Data and communications
- Drywall
- Plumbing fixtures
- Casework and countertops
- Non-porous sheet rubber flooring
- Interior/Exterior painting and wall finishes
- Roadway paving, striping, and signage
- Sidewalks/Curb & Gutters
- Landscape and irrigation
- Storm sewer and drainage conveyance systems